BITS Pilani

  • Page last updated on Wednesday, November 29, 2023

List of Projects

banner
Innovate. Achieve. Lead.

Research projects completed / ongoing

LIST OF PROJECTS (FUNDED)

 

Total Projects funded: 10

 

Total amount funded till date: Approved ~930 lakhs / Sanctioned: ~846 lakhs
 
Funding agencies: Ministry of Fertilizers, DST-SERB, Gail (India) Ltd., Centre for High Technology, Thermax Ltd., Aditya Birla Group
 
Project 1: Techno-economic feasibility studies on an alternative process route for removal of methanol, ammonia and carbon di-oxide from process condensate in an ammonia fertilizer plant 

 

FUNDING AGENCY: DEPARTMENT OF FERTILIZERS (Grants-in-Aid Bill No: 15061/2/2006)

 

FUNDING SANCTIONED: Rs. 86,98,800/-

Duration: 3 years

 
Status: Completed 
 
 

Project 2: High - efficiency energy conversion in steam boilers using unmixed combustion  

 

FUNDING AGENCY: Department of Science and Technology (DST)

 

FUNDING SANCTIONED: Rs. 31,05,000/-

 

COLLABORATIVE FUNDING: Rs. 4,00,000/- (Thermax Limited Pune) 
 
Duration: 3 years
 
Status: Completed
 

 

Project 3: Coke reduction and selectivity increase using novel reactor configurations for allyl chloride process

 

FUNDING AGENCY: Aditya Birla Group

 

FUNDING SANCTIONED: Rs. 10,00,000/-

 

Duration: 2 years 
  
Status: Completed
 
 

Project 4: Studies on an enhanced efficiency contactor and once-through aqueous ammonia-based flue gas CO2 capture process scheme for reuse in fertilizer production

FUNDING AGENCY: Aditya Birla Group

 

FUNDING SANCTIONED: Rs. 10,00,000/-

 

Duration: 2 years 
  
Status: Completed


 

Project 5: LNG regasification integrated with Freeze desalination

 

FUNDING AGENCY: GAIL (India) Limited

 

SANCTIONED BUDGET: Rs. 3,82,21,000/-
 
Duration: 3 years 


Status: Completed

 

 

Project 6Experimental and Simulation studies on coke mitigation in petroleum refinery systems

 

FUNDING AGENCY: Centre for High Technology (CHT); Collaboration with Bharat Petroleum Corporate R & D Centre

 

SANCTIONED BUDGET: Rs. 1,68,17,700/- 

 

Duration: 3 years 

 

Status: Completed

 

 

Project 7: Theoretical and experimental studies on unmixed steam reforming for hydrogen production 

 

FUNDING AGENCY: DST - SERB

 

SANCTIONED BUDGET: Rs. 40,70,370/- 

 

Duration: 3 years
 

Status: Completed 

 
 

Project 8:  Studies on CO fueled self-sustaining unmixed combustion (UMC) reactor for integrated CO2 capture and power steam generation

 
FUNDING AGENCY: DST - SERB (UNDER THE MISSION INNOVATION CHALLENGE CALL FOR CARBON CAPTURE)

 

APPROVED / SANCTIONED BUDGET: Rs. 78.61,832/- / Rs. 49,74,536/-

Duration: 3 years

 
Status: Ongoing

 

 

Project 9:  Recovery of water from tail gas streams exiting carbon black plants 

 

FUNDING AGENCY: DST - SERB (UNDER THE MISSION INNOVATION CHALLENGE CALL FOR CARBON CAPTURE
 
APPROVED / SANCTIONED BUDGET: Rs. 63,00,000/-
 
Duration: 5 years
 
Status: Ongoing
 
Project 10:  Advanced High Temperature High Pressure OSR materials for Unmixed Combustion  

 

FUNDING AGENCY: SPARC  
  
APPROVED / SANCTIONED BUDGET: Rs. 41,20,430/-
 
Duration: 2 years
 
Status: Ongoing 

 

 
LIST OF PROJECTS COMPLETED (NON-FUNDED)
 

Project 1: Co-Chlorination of Polyolefins in Paraffin – A greener alternative to conventional solvent-based chlorination

 

COLLABORATTING AGENCY: Aditya Birla Science &Technology Centre

 

Status: Completed (1 PhD student graduated; 1 patent granted)

 

 

Project 2: Techno-feasibility studies on a Closed Loop Advanced Sanitation System (CLASS) for blackwater treatment

 

Project supported by the Bill & Melinda Gates Foundation and in collaboration with Kohler India

 

Status: Completed (1 PhD student graduated)

  
 

Quick Links

    An Institution Deemed to be University estd. vide Sec.3 of the UGC Act,1956 under notification # F.12-23/63.U-2 of Jun 18,1964

    © 2024 Centre for Software Development,SDET Unit, BITS-Pilani, India.

    Designed and developed by fractal | ink design studios